Exterior painting in New Zealand costs $35–$80 per m². A full exterior repaint of a 3-bedroom home runs $4,500–$15,000.
Where your quote lands depends on cladding type, surface condition, access requirements, paint system, and coastal exposure. Each is broken down below.
For whole-house pricing, see the full NZ painting cost guide.
NZ painter pricing data - updated 11 July 2026.
Page last reviewed: 12 July 2026
Budget for an exterior repaint, understand what drives the price, and compare quotes with confidence.
Use these exterior benchmarks to sense-check your rates by surface type, access, and scope.
Try the quoting tool →| Surface Type | Cost Per m² | Typical Home Cost | Prep / Scope |
|---|---|---|---|
| Weatherboard | $35–$55 | $5,000–$10,000 | Wash, scrape, sand, spot-prime bare timber, 2 coats |
| Plaster / stucco | $40–$65 | $5,500–$12,000 | Crack repair, seal, prime problem areas, 2 coats |
| Brick | $30–$50 | $4,000–$9,000 | Water-blast, minimal repairs, 2 coats exterior paint |
| Concrete block | $35–$55 | $4,500–$10,000 | Wash, seal porous surfaces, 2 coats |
| Cedar / timber | $45–$80 | $6,000–$15,000 | Sand, treat tannin bleed, specialist stain or oil system |
| Roof (iron / steel) | $25–$45 | $3,000–$8,000 | Water-blast, rust treatment if needed, primer + 2 coats |
These are guide prices only. Heavy prep, repairs, difficult access, and coastal exposure can materially increase the final quote.
Exterior rates run higher than interior because the paint system, prep, and access are all heavier.
Prep and access are the two biggest variables in most exterior quotes.
A proper exterior quote should cover:
The quote should also state what is not included - rotten timber replacement, major plaster repairs, guttering, and work needing a separate trade. For a step-by-step walkthrough of what goes into a proper quote, see our quoting guide.
If a quote looks cheap, check what's been left out. Excluding washing, priming, or scaffold can make a price look 30–50% lower than one covering the full job.
Ladders only - Usually enough for single-storey homes with clear ground access.
Scaffolding - Two-storey homes almost always need full scaffold, $1,500–$4,000 depending on perimeter length and complexity.
Edge protection / harnesses - Required for steep rooflines, gable ends, or anywhere a fall risk exists. Some councils mandate edge protection above a certain height.
Factors that push access costs higher:
Always check whether scaffolding is included in the quote or listed as a separate line item.
Get connected with local tradies who can quote your job.
Use ATT to quote faster, win more work, and run your painter business.
NZ has some of the highest UV levels in the world, and exterior coatings take constant punishment from rain, salt, and temperature swings. The right system for the surface matters more than saving $20 per tin.
Premium systems ($100–$150/10L) last 8–12 years. Budget paint ($40–$60/10L) needs replacing in 4–6. Over a 15-year cycle the premium option is often cheaper once you factor in labour for the second repaint. For full repaint pricing, see our guide to painting a house in NZ.
Before using any published price range, confirm the scope, measurements, substrate condition, prep level, number of coats, paint system, access, exclusions, waste, GST, and target margin. You should also separate labour from materials so you can see whether the job is profitable.
Use these price ranges as a starting point, then build a structured quoting workflow: capture the enquiry, inspect the site, measure the work, build the quote, send it, follow up, schedule the crew, track job costs, and invoice. ATT is built to keep that full workflow together for New Zealand painting and decorating businesses.
$4,500–$15,000 for a standard 3-bedroom home. The final price depends on cladding type, surface condition, access requirements, and whether scaffolding is needed.
A proper quote covers water-blasting, scraping and sanding, priming, two topcoats, access equipment, and clean-up. Major timber repairs and plastering are usually excluded or quoted separately.
8–12 years with a premium paint system. Budget coatings needs replacing in 4–6 years. Coastal homes and high-UV areas shorten the cycle - expect 5–7 years near the coast.
Single-storey homes usually only need ladders. Two-storey homes almost always need scaffold at $1,500–$4,000. Check whether it is included in the quote or charged separately.
Not recommended. Exterior paint needs temperatures above 10°C and low humidity to cure properly. Most NZ painters schedule exterior work from October through April.
Include scope, prep, materials, access, labour, subcontractors, waste, GST, and margin. The range is only useful once those assumptions are explicit.
Get connected with local tradies who can quote your job.
Use ATT to quote faster, win more work, and run your painter business.